Material Guantity Calculation In Rcc Work

  • Thumb Rules For Civil Engineering | Thumb Rules For Civil ...

    Thumb Rules For Civil Engineering | Thumb Rules For Civil ...

    4. Thumb Rules For Shuttering Work. Shuttering costs are taken as 1518% of the total construction of the work is done to bring the concrete in Thumb rule to estimate the shuttering required is 6 times the quantity of concrete or times of the Plinth area.. For example, the concrete quantity is 3, then. Area of Shuttering is x 6 = 3m 2

  • How To Calculate Steel Quantity For RCC Beam, Column And Slab

    How To Calculate Steel Quantity For RCC Beam, Column And Slab

    Following are the steps to calculate the quantity of steel for RCC slab 1. Prepare a bar bending schedule in order to classify different shapes of bars (bent up bar, .

  • material calculation of rcc

    material calculation of rcc

    Apr 20, 2018· BrickWork Calculation best automatic calculator to find quantity of bricks with or without mortar and you can also add thickness of RCC bed if required in calculation Types of Bricks, How to calculate the no of bricks required for 1 cubic meter, No of bricks required in a wall...

  • Contract Rates Specifiions for your Home Construction

    Contract Rates Specifiions for your Home Construction

    PARAPET WORK: Single work shall be used for the parapet work. REINFORCED STEEL: Fixing steel reinforcement (High Yield Strength Deformed Bars Conforming to Fe 500) for RCC in all items, work including transporting, recoiling, cutting, straightening, bending and placing in position at all levels binding with approved gauge binding wire.

  • How To Calculate Steel Quantity Of Lintel Beam

    How To Calculate Steel Quantity Of Lintel Beam

    Oct 05, 2021 · STEP1: Calculate Length Of One Main Bar. Length of one bar = Length of door opening + (2 x bearing length) – clear cover for both sides. Length of door = 1200mm Bearing length = 150mm (15 0 mm to 200 mm bearing length should be provided and it should be placed on the motor.). Clear cover = 25mm (we will take 25mm as clear cover)

  • CPWD SPECIFICATIONS

    CPWD SPECIFICATIONS

    properties and chemical composition of TMT bars, stripping time of formwork for RCC work using OPC 43 grade cement and PPC, surface treatment of shuttering by polymer based water soluble compounds, gas pressure welding and RMC incorporated. Work: Specifiions of mechanized autoclave fly ash lime bricks, sewer bricks, burnt clay

  • material guantity calculation in rcc work

    material guantity calculation in rcc work

    material guantity calculation in rcc work. Rate Analysis of RCC (Reinforcement Cement Concrete) Plain Cement Concrete (PCC) is composed mixture of cement, aggregates, sand, water and chemical admixtures. Calculate portland cement concrete or PCC concrete mix design ratio in Cft and determine exactly how much quantity of cement, sand and aggregate is required for PCC construction. Online ...

  • Material Quantity Calculation in SAP PPPI | SAP Community

    Material Quantity Calculation in SAP PPPI | SAP Community

     · Material Quantity Calculation in SAP PPPI. I define All Master Data ( Production Version, BOM, Recipe), For MQC I create Characteristics as a POTENCY in %, Create Class ROHMAT and Assign Potency to it in %, Create MIC req. formula, Create Inspection Plan assign formula LODAssay, I got Potency here, For API I done PO and GR, then Quality Lot ...

  • Construction Board: Rate Analysis of PCC : (Plain Cement ...

    Construction Board: Rate Analysis of PCC : (Plain Cement ...

     · Labour work for RCC. Cum. . Crush Sand. Cum. 1,095 ... Material Density can be changed as per Quarry loion and Material quality, as well as Cement content, can be changed as per quarry Material quality. Generally A lot of Builders, contractors are using thumb rule when doing PCC work. General The market rate of PCC work. PCC with Material: Rs. 3500 .

  • Rate analysis for PCC 1:4:8 ()

    Rate analysis for PCC 1:4:8 ()

    Rate analysis for PCC 1:4:8 () – calculate quantity cost, hi guys in this article we know about rate analysis for PCC grade Rate analysis comprise of sum of material cost, labour cost, overhead expenses, contractor profit and cost of equipment or tools. And also know about cost and quantity of cement, sand aggregate water required for 1 cubic metre of concrete.

  • How to Calculate Quantity of Material For Plaster?

    How to Calculate Quantity of Material For Plaster?

    Calculation of quantity of material for 12 mm thick plaster of ratio 1: 6 (1 Cement:6 Sand) in the wall for 100 Sqm. The volume of mortar = Area × Thickness. = 100 × .

  • Cost Estimation RCC Building Excel Sheet

    Cost Estimation RCC Building Excel Sheet

    Jul 12, 2021 · Cost Estimation RCC Building Excel Sheet In order to determine the rate of a particular item, the factors affecting the rate of that item are studied carefully and then finally a rate is decided for that item. This process of determining the rates of an item is termed as analysis of rates or rate analysis.

  • RCC | Construction basics retold | Page 4

    RCC | Construction basics retold | Page 4

    Nov 04, 2020 · Today, let us analyze a RCC beam completely as per the drawing. First, have a look at the RCC drawing for the ground beam. Now look at the schedule of Beams. We have randomly selected beam no P7 for the study today. The beam looks like this : For finding the cutting lengths of the various bars, we need to know the SPANS.

  • Concrete Calculator

    Concrete Calculator

    Related Volume Calculator. Concrete is a material comprised of a number of coarse aggregates (particulate materials such as sand, gravel, crushed stone, and slag) bonded with cement. Cement is a substance that is used to bind materials, such as aggregate, by adhering to said materials, then hardening over time.

  • Civil At Work: How to prepare rate analysis for Reinforced ...

    Civil At Work: How to prepare rate analysis for Reinforced ...

    Oct 17, 2018 · It varies from 10 20%. For our case lets assume it as 15% of total cost of materials, labours and equipments. We have calculated the quantity of every item in above 13 steps. For rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work.

  • Cost Estimation RCC Building Excel Sheet In order to ...

    Cost Estimation RCC Building Excel Sheet In order to ...

    Cost Estimation RCC Building Excel Sheet In order to determine the rate of a particular item, the factors affecting the rate of that item are studied carefully and then finally a rate is decided for that item. This process of determining the rates of an item is termed as analysis of rates or rate analysis.

  • how to calculate 1 sq foot rcc, work and plastering rate

    how to calculate 1 sq foot rcc, work and plastering rate

     · Dear Sir, rates can be calculated as under. RCC ( 1:2:4) per 35 cubic . : cement bags + sand 13 bag + aggregates 26 bags work per 35 cubic feet : cement bag + 31 bag sand Plastering per 10 square feet : cement bags + bags now for each calculated rates add 30 % labor cost + 3 % contangencies. you will get appox. rates.